Yokogawa wins control system order for geothermal plant in Indonesia

Yokogawa Electric Corp. said Oct. 10 its subsidiary in Indonesia has won an order to supply the control system for a renovation project at the Lahendong geothermal power plant on Sulawesi Island.

P.T. Yokogawa Indonesia will be responsible for engineering, installing and commissioning the new Centum VP integrated production control system in the 20-megawatt No. 1 power generation unit. The system will replace the old one, which was used to control steam turbine auxiliary facilities.

read more

Posted October 10, 2013 by repit in News

%d bloggers like this: