10.000 MW

FAST TRACK PROGRAMME 1

Project Development Acceleration of coal-fired Power Generation based on Presidential Regulation Number 71 Year 2006 dated July 5, 2006 regarding the assignment to PT. PLN (Persero) to Accelerate Development of coal Power Plants.
This President Regulation became the basis for the construction of 10 power plants in Java and 25 power plants in Outer Java-Bali, known as Project Acceleration 10,000 MW power plant. Construction of the projects which are in order to pursue the project of electric power supply that will run a deficit for several years, are also intended to support diversification of energy for power generation to the non-oil fuel (BBM) by utilizing a low-calorie coal reserves which are abundant in the homeland. Power plant construction project was expected to be ready for operation in 2009/2010.

Whereas the location for PLTU in Jawa are as follows :

No

Power Plant

Location

Capacity (MW)

1

PLTU 1 Banten

Suralaya

1 x 625 MW

2

PLTU 2 Banten

Labuhan

2 x 300 MW

3

PLTU 3 Banten

Lontar

3 x 315 MW

4

PLTU 1 Jawa Barat

Indramayu

3 x 330 MW

5

PLTU 2 Jawa Barat

Pelabuhan Ratu

3 x 350 MW

6

PLTU 1 Jawa Tengah

Rembang

2 x 315 MW

7

PLTU 2 Jawa Tengah

Cilacap

1 x 600 MW

8

PLTU 1 Jawa Timur

Pacitan

2 x 315 MW

9

PLTU 2 Jawa Timur

Paiton

1 x 660 MW

10

PLTU 3 Jawa Timur

Tanjung Awar – Awar

2 x 300 MW

For PLTU outside Jawa Bali :

No

Power Plant

Capacity (MW)

1

PLTU NAD

2 x 100 MW

2

PLTU 2 Sumatra Utara

2 x 200 MW

3

PLTU Sumatra Barat

2 x 100 MW

4

PLTU 3 Bangka Belitung

2 x 25 MW

5

PLTU 4 Bangka Belitung

2 x 15 MW

6

PLTU 1 Riau

2 x 10 MW

7

PLTU 2 Riau

2 x 7 MW

8

PLTU Kepulauan Riau

2 x 7 MW

9

PLTU Lampung

2 x 100 MW

10

PLTU 1 Kalimantan Barat

2 x 50 MW

11

PLTU 2 Kalimantan Barat

2 x 25 MW

12

PLTU 1 Kalimantan Tengah

2 x 60 MW

13

PLTU Kalimantan Selatan

2 x 65 MW

14

PLTU 2 Sulawesi Utara

2 x 25 MW

15

PLTU Sulawesi Tenggara

2 x 10 MW

16

PLTU Sulawesi Selatan

2 x 50 MW

17

PLTU Gorontalo

2 x 25 MW

18

PLTU Maluku

2 x 15 MW

19

PLTU Maluku Utara

2 x 7 MW

20

PLTU 1 NTB

2 x 15 MW

21

PLTU 2 NTB

2 x 25 MW

22

PLTU 1 NTT

2 x 7 MW

23

PLTU 2 NTT

2 x 15 MW

24

PLTU 1 Papua

2 x 7 MW

25

PLTU 2 Papua

2 x 10 MW

Out of 35 locations to be developed, PT. PLN has signed EPC contracts for 32 locations

NO

NAME

LOCATION

CAPACITY

CONTRACTORS

1

 PLTU Labuan Banten

2 x 300 MW

Kons. Chengda + Truba Jurong

2

 PLTU Rembang Central Java

2 x 315 MW

Kons. Zelan + Tronoh + Priamanara

3

 PLTU Indramayu West Java

3 x 330 MW

Kons. Sinomash + CNEEC + PT Penta Adi Samudra

4

 PLTU Paiton East Java

1 x 660 MW

Kons. Harbin Power Engineering + Mitra Selaras Hutama Energi

5

 PLTU Suralaya Banten

1 x 625 MW

Kons. CNTIC + Rekayasa Industri

6

 PLTU Pacitan East Java

2 x 315 MW

Kons. Dongfang Electric + Dalle Energy

7

 PLTU Pelabuhan Ratu West Java

3 x 350 MW

Kons. Shanghai Electric + Maxima Infrastruktur

8

 PLTU Teluk Naga / Lontar Banten

3 x 315 MW

Kons. Dongfang Electric + Dalle Energy

9

 PLTU Tj. Awar-awar East Java

2 x 350 MW

Kons. Sinomach + CNEEC + PT Penta Adi Samudra

10

 PLTU Adipala Central Java

1 x 600 MW

Kons. CNTIC + Shanghai Electric Group Comp, Ltd + PT Cahaya Mulia Energi Konstruksi + Bairagraha Sentranusa

11

 PLTU Pangkalan Susu North Sumatera

2 x 220 MW

Kons. Guangdong Power Eng. Corp. + PT Nincec Multi Dimensi + PT Bagus Karya

12

 PLTU Tj. Bale Karimun Riau Islands

2 x 7 MW

Kons. Shangdong Machinary Import/Export Corp. + PT Rekadaya Electrika

13

 PLTU Meulaboh Aceh

2 x 110 MW

Synohydro Corporation, Ltd.

14

 PLTU Bengkalis Riau

2 x 10 MW

Kons. PT Modaco Enersys + PT Kelsri + PT Angkasa Buana Cipta + Guandong Machinery I & E Co. Ltd.

15

 PLTU Selat Panjang Riau

2 x 7 MW

PT Boustead Maxitherm Industries

16

 PLTU Bengkayang West Kalimantan

2 x 27,5 MW

Kons. PT Indo Fuji Energi + Guandong Machinery I & E Co. Ltd + PT Persada Inti Energi + PT Advance Technology Indonesia

17

 PLTU Asam-asam #3, 4 South Kalimantan

2 x 65 MW

Kons. PT Wijaya Karya (Persero) + Chengda Engineering Coorporation of China

18

 PLTU Pulang Pisau Central Kalimantan

2 x 60 MW

Kons. PT. Bagus Karya & Fujian Longking Co., Ltd

19

 PLTU Teluk Sirih West Sumatera

2 x 112 MW

Kons. CNTIC + Rekayasa Industri

20

 PLTU Tarahan Baru Lampung

2 x 100 MW

Kons. PT Adi Karya (Persero) + Jiangxi Electrical Power Design Institute

21

 PLTU Belitung Bangka – Belitung

2 x 30 MW

Kons. PT Truba Alam Manunggal Engineering + China Shanghai (Group) Corporation for Foreign Economic & Technological Coorporation

22

 PLTU Belitung Bangka – Belitung

2 x 16,5 MW

Kons. PT Poeser Indonesia + Shangdong Machinery & Equip I/E Group Corp

23

 PLTU Gorontalo Gorontalo

2 x 25 MW

PT Meta Epsi

24

 PLTU Amurang North Sulawesi

2 x 25 MW

PT Wijaya Karya (Persero)

25

 PLTU Kendari South East Sulawesi

2 x 10 MW

Kons. Shangdong Machinary Import/Export Corp + Rekadaya Electrika

26

 PLTU Barru South Sulawesi

2 x 50 MW

Kons. Hubei Hongyuan Engineering Co. Ltd. + PT Bagus Karya

27

 PLTU Bima West Nusatenggara

2 x 10 MW

Kons. PT Modaco Enersys + PT Kelsri + PT Angkasa Buana Cipta + Guandong Machinery I&E Co. Ltd.

28

 PLTU Lombok West Nusatenggara

2 x 25 MW

PT Barata Indonesia (Persero)

29

 PLTU Ende East Nusatenggara

2 x 7 MW

Kons. Shangdong Machinary Import/Export Corp. + Rekadaya Electrika

30

 PLTU Kupang East Nusatenggara

2 x 16,5 MW

Kons. PT Poeser Indonesia + Shandong Machinery & Equip I/E Group Corp.

31

 PLTU Tidore North Maluku

2 x 7 MW

Kons. Shandong Machinary I&E Corp. + PT Rekadaya Electrika

32

 PLTU Jayapura Papua

2 x 10 MW

Kons. PT Modern Widya Technical + PT Boustead Maxitherm Industries

33

PLTU Maluku Maluku

2 x 15 MW

Tender process

34

PLTU Papua Papua

2 x 7 MW

Tender process

35

PLTU Kalbar West Kalimantan

2 x 50 MW

Tender process

The Progress of the First 10.000 MW Power Plant (PLTU) Project

Tuesday, 17 AGUSTUS 2010 Ministry of the Energy and Mineral Resources

JAKARTA. The implementation of the first 10.000 MW PLTU project is always improving.  Last 2009, the first generator finished was PLTU Labuan (2x300MW. In 2010, it is hoped that some generators will follow with the total amount is almost 1.400 MW which are 3 locations in Java and 5 outside Java.

Those generators are PLTU Rembang Unit 1 (315 MW), PLTU Indramayu Unit 1 (330 MW), PLTU Suralaya (625 MW). Besides, there are also generators outside Java such as PLTU Tanjung Balai Karimun (2×7 MW), PLTU Bangka (30 MW), PLTU Amurang (25 MW), PLTU Kendari (2×10 MW), and PLTU Ende (2×7 MW).

Thereby, in 2010 the implementation of 10.000 MW electricity project has finished generator construction of PLTU for about 2.000 MW. This is a positive solution because this project has fully started from 2007. A year before is needed to finish planning problem, fund negotiation, and the other administration needs.

Even in 2011, the progress of this project will bring happiness because there will be finished generators for about 4.300 MW which spread in 5 locations in Java and 12 locations outside Java. So, we will be finish 25 locations from 37 total locations in Indonesia

Locations for that project are PLTU Pacitan (2×315 MW), PLTU Rembang (1×350 MW), PLTU Lontar (3×315 MW), PLTU Indramayu (3×330), and PLTU Pelabuhan Ratu (1 x 350 MW). And then the total locations outside Java which almost 1.000 MW are PLTU Sumbagut (2×200 MW), PLTU Lampung (1×100 MW), PLTU Bangka Belitung (30 MW), PLTU Kalsel (2×65 MW), PLTU Sulsel (2×50 MW), PLTU Lombok (2×25 MW), PLTU Gorontalo (2×25 MW), PLTU Amurang (1×25 MW), PLTU NTT (2×6,5 MW), PLTU Bima (2×10 MW), PLTU Jayapura (2×10 MW), and PLTU Maluku Utara (2×7 MW).

By the finishing of generators in Java and especially outside Java, so by 2011 the total generators which will be finished are 6.300 MW. It could be said that two third of electricity project planning 10.000 MW can be finished for about less than 4, 5 years. The rest which is 3.700 MW will be finished in the next years.

There are still some unfinished projects especially because of the land problem such as land acquisition, overlap with another sector, the moving location because the land condition is not conducive. Besides, it is because of the climate factor which is less support physical construction of the building. Another factor is there are additional project which is newly added in 2009 such as PLTU Riau (2×100 MW) and PLTU Kaltim 2×100 MW which are in tender process. Both of these projects are finished in 2013-2014.

According to the existence program, by 2013 almost all 10.000 MW electricity project could be finished. Huge generators such as PLTU Cilacap (600 MW), PLTU Tanjung Awar-awar (2×350 MW), and PLTU Pelabuhan Ratu (2×350 MW) will finish at least 9.500 MW or 95% of all project. So that electricity producttion can be enjoyed by Indonesian. For PLN, finishing this project will be able to decrease the fuel to generate electricity. It means that subsidize given to PLN could be decreased so that those subsidize could be used for other sectors’ need. (AK)

FAST TRACK PROGRAMME 2

PLN 10.000 MW PHASE II PROJECTS SUMMARY

Regulation of the Minister of Energy and Mineral Resources (EMR) No.02 of 2010 on the List of Projects Development Acceleration of Electricity using Renewable Energy, Coal and Gas and Transmission Association

To be built by PLN :

NO

 

PROJECT NAME

UNIT CAPACITY

LOCATION

1

PLTA Upper Cisokan,

4×250 MW

West Java

2

PLTGU Muara Tawar ad on 2,3 and 4

1×150 MW and 3×350 MW

West Java

3

PLTP Ijen

2×55 MW

East Java

4

PLTP Kamojang 5 and 6

1×40 MW and 1×60 MW

West Java

5

PLTP Kotamobagu 1 and 2

2×20 MW

North Sulawesi

6

PLTP Kotamobagu 3 and 4

2×20 MW

North Sulawesi

7

PLTP Iyang Argopuro

1×55 MW

East Java

8

PLTP Sembalun

2×10 MW

NTB

9

PLTP Sungai Penuh

2×55 MW

Jambi

10

PLTP Tangkuban Perahu I

2×55 MW

West Java

11

PLTP Tulehu

2×10 MW

Maluku

12

PLTP Wilis/Ngebel

3×55 MW

East Java

13

PLTU Asahan 3

2×87 MW

North Sumatera

14

PLTU Hululais

2×55 MW

Bengkulu

15

PLTU Indramayu

1×1.000 MW

West Java

16

PLTU Kaltim (Peaking)

2×50 MW

East Kalimantan

17

PLTU Kotabaru

2×7 MW

Sth Kalimantan

18

PLTU Pangkalan Susu 3 and 4

2×200 MW

North Sumatera

19

PLTU Parit Baru

2×50 MW

West Kalimantan

20

PLTU Sampit

2×25 MW

Cntl Kalimantan

21

PLTU Takalar

2×100 MW

South Sulawesi

To be built by IPPs

NO

 

PROJECT NAME

UNIT CAPACITY

LOCATION

1

PLTA Madura

1×400 MW

East Java

2

PLTA Simpang Aur

2x6MW and 2×9 MW

Bengkulu

3

PLTGU Bangkanai

1×120 MW

Cntrl Kalimantan

4

PLTGU Senoro

2×120 MW

Central Sulawesi

5

PLTP Atadei

2×2,5 MW

NTT

6

PLTP Baturaden

2×110 MW

Central Jawa

7

PLTP Bora

1×5 MW

Central Sulawesi

8

PLTP Cibuni

1×10 MW

West Java

9

PLTP Cisolok – Sukareme

1x50MW

West Java

10

PLTP Dieng

1×55 MW and 1×60 MW

Central Jawa

11

PLTP Drajat

2×55 MW

West Java

12

PLTP Guci

1×55 MW

Central Java

13

PLTP Huu

2×10 MW

NTB

14

PLTP Jaboi

1×7 MW

Aceh

15

PLTP Jailolo

2×5 MW

North Maluku

16

PLTP Karaha Bodas

1×30 MW and 2×55 MW

West Java

17

PLTP Lahendong 5 and 6

2×20 MW

North Sulawesi

18

PLTP Lumut Balai

4×55 MW

South Sumatera

19

PLTP Mangolo

2×5 MW

Sth East Sulawesi

20

PLTP Merana/Masaingi

2×10 MW

Central Sulawesi

21

PLTP Muaralaboh

2×110 MW

West Sumatera

22

PLTP Patuha

3×60 MW

West Java

23

PLTP Rajabasa

2×110 MW

Lampung

24

PLTP Rantau Dadap

2×110 MW

South Sumatera

25

PLTP Rawa Dano

1×110 MW

Banten

26

PLTP Salak

1×40 MW

West Java

27

PLTP Sarulla 1

3×110 MW

North Sumatera

28

PLTP Sarulla 2

2×55 MW

North Sumatera

29

PLTP Seulawah Agam

1×55 MW

Aceh

30

PLTP Songa Wayaua

1×5 MW

North Maluku

31

PLTP Sorik Merapi

1×55 MW

North Sumatera

32

PLTP Sukoria

2×2,5 MW

NTT

33

PLTP Tampomas

1×45 MW

West Java

34

PLTP Tangkuban Perahu II

2×30 MW

West Jawa

35

PLTP Ulubelu 3 and 4

2×55 MW

Lampung

36

PLTP Ungaran

1×55 MW

Central Java

37

PLTP Wayang Windu

2×120 MW

Wes Java

38

PLTU Andai

2×7 MW

West Papua

39

PLTU Bali Timur

2×100 MW

Bali

40

PLTU Bangka

2×30 MW

Bangka Belitung

41

PLTU Bau-bau

2×10 MW

Sth East Sulawesi

42

PLTU Biak

2×7 MW

Papua

43

PLTU Jayapura

2×15 MW

Papua

44

PLTU Kalsel

2×100 MW

Sth Kalimantan

45

PLTU Kaltim

2×100 MW

East Kalimantan

46

PLTU Kendari

2×25 MW

Sth East Sulawesi

47

PLTU Ketapang

2×10 MW

West Kalimantan

48

PLTU Kolaka

2×10 MW

Sth East Sulawesi

49

PLTU Larantuka

2×4 MW

NTT

50

PLTU Luwuk

2×10 MW

Central Sulawesi

51

PLTU Mamuju

2×7 MW

West Sulawesi

52

PLTU Masohi

2×4 MW

Maluku

53

PLTU Melak

2×7 MW

East Kalimantan

54

PLTU Merauke

2×7 MW

Papua

55

PLTU Moutong

2×4 MW

Central Sulawesi

56

PLTU Nabire

2×7 MW

Papua

57

PLTU Nias

2×7 MW

North Sumatera

58

PLTU Nunukan

2×7 MW

East Kalimantan

59

PLTU Petung

2×7 MW

East Kalimantan

60

PLTU Putussibau

2×4 MW

West Kalimantan

61

PLTU Sabang

2×4 MW

Aceh

62

PLTU Selayar

2×4 MW

South Sulawesi

63

PLTU Sorong

2×15 MW

West Papua

64

PLTU Sumbawa

2×10 MW

NTB

65

PLTU Tahuna

2×4 MW

North Sulawesi

66

PLTU Tanjung Balai Karimun

2×10 MW

Riau Islands

67

PLTU Tanjung Batu

2×4 MW

Riau Islands

68

PLTU Tanjung Pinang

2×15 MW

Riau Islands

69

PLTU Tidore

2×7 MW

North Maluku

70

PLTU Tobelo

2×4 MW

North Maluku

71

PLTU Tual

2×4 MW

Maluku

72

PLTU Waingapu

2x4MW

NTT

Source : Ministry of Energy and Mineral Resources


Cancelled Projects of Fast Track Program 2

  1. PLTU Bali Timur
  2. PLTGU Muara Tawar Add-on 3 & 4
  3. PLTGU Senoro
  4. PLTU Masohi
  5. PLTU Waingapu
  6. PLTU Moutong
  7. PLTP Drajat
  8. PLTP Salak

Funded by State Budget

  1. PLTU Sampit
  2. PLTU Kotabaru
  3. PLTU Tidore
  4. PLTG Kaltim (peaking)

Changes in Projects FTP II

related article :

last updated 5 March 2014 


Posted May 29, 2011 by repit

Follow

Get every new post delivered to your Inbox.

Join 68 other followers

%d bloggers like this: