NO

NAME

OWNER

UNIT

CAPACITY/MW

1

NANGGROE ACEH DARUSALAM
EXISTING

1

PLTU Media Group PT. Energy Alam Raya

1

                15.00

2

PLTU Semen Andalas PT. Semen Andalas

1

                30.00

3

PLTU Rancong PT. Jorindo Aceh Power

1

                30.00

4

PLTU Kertas Kraft Aceh (KKA) PT. Kertas Kraft Aceh

2

                36.00

5

PLTU NAD-Nagan Raya PLN (EPC : Sinohydro Co. Ltd)

2

              220.00

              331.00

ONGOING / PROPOSED

1

PLTU Sinabang PLN

2

                   6.00

2

PLTU Singkil PLN

2

                   6.00

3

PLTU Tapaktuan PLN

2

                14.00

                26.00

2

NORTH SUMATERA
EXISTING

1

PLTU Labuhan Angin PLN – North Sumatera Generation Unit

2

              230.00

2

PLTU Pangkalan Susu 1 PLN

1

              200.00

              430.00

ONGOING / PROPOSED

1

PLTU Pangkalan Susu 2 PLN

1

              200.00

2

PLTU Pangkalan Susu Baru/FTP 2 – Unit 3 & 4 PLN (EPC : Sinohydro Corporation Limited-PT Nusantara Energi Mandiri )

2

              400.00

3

PLTU Nias  PT Irsac Power

2

                14.00

4

PLTU Sibolga PT. Tenaga Listrik Sibolga

2

              200.00

5

PLTU Paluh Merbau PT. Gregory Energy

2

              300.00

6

PLTU Kuala Tanjung / Sumut 2 PT. Ranyza Energy

2

              270.00

          1,384.00

3

RIAU
EXISTING

1

ONGOING / PROPOSED

1

PLTU Bengkalis/Riau 1 FTP 1 PLN

2

                20.00

2

PLTU Tembilahan PLN (EPC : PT. Adhi Karya)

2

                14.00

3

PLTU Rengat PT. Central Korporindo

2

                14.00

4

PLTU Cirenti / PLTU Riau Mulut Tambang PTBA + Lanco Infratech Ltd

2

              600.00

5

PLTU Tenayan Pekanbaru Hubei Hongyuan Power Engineering & Rekayasa Industri

2

              220.00

6

PLTU Riau / FTP 1 PT. Riau Power

2

              220.00

7

PLTU Dumai – KID PLN

2

              330.00

8

PLTU Bukit Batu PT Riau Energi Tiga, PT ZUG Industry Indonesia, PT Pengembangan Investasi Riau (PIR)

2

                70.00

9

PLTU Peranap PLN, PT. Bukit Asam  (PTBA), Tenaga Nasional Berhard (TNB)

2

          1,240.00

          2,728.00

4

RIAU ISLANDS
EXISTING

1

PLTU Tanjung Balai Karimun PLN – Riau Regional Unit

2

                14.00

2

PLTU Tanjung Kasam PT. Tanjung Kasam Power Batam (PT. TJK Power)

2

              110.00

              124.00

ONGOING / PROPOSED

1

PLTU Tanjung Batu PLN – Riau Regional Unit

1

                   3.00

2

PLTU Tanjung Pinang I PT. Tenaga Listrik Bintan (PT.Ekplitasi energi 60%, Menamas 25%,PT.Pembangunan Kepri 10%, PT. Multi Resources 5%)

2

             21.60

3

PLTU Tanjung Pinang II / FTP 2 IPP

2

         30.00

4

PLTU Tanjung Balai Karimun II IPP

2

     20.00

5

PLTU Tanjung Balai Karimun III IPP

1

         10.00

6

PLTU Dabo Singkep PLN – Riau Regional Unit

2

               6.00

7

PLTU Tanjung Uban PLN – Riau Regional Unit

2

            14.00

8

PLTU Karimun PT. Wana Bara & Soma Daya Utama

2

        50.00

9

Tanjung Pinang – Galang Batang PLN – Riau Regional Unit

1

             30.00

10

              184.60

5

WEST SUMATERA
EXISTING

1

PLTU Ombilin – Padang PLN-South Sumatera Generation Unit

2

              200.00

2

PLTU Sumbar – Teluk sirih unit 1 PLN & CNTIC (China National Tecnical Import Corporation)

1

              112.00

              312.00

ONGOING / PROPOSED

1

PLTU Sumbar – Teluk sirih unit 2 PLN & CNTIC (China National Tecnical Import Corporation)

1

              112.00

2

PLTU Sumbar I – Kambang PT. Inti Energy Abadi

2

              200.00

3

PLTU Mentawai PLN-South Sumatera Generation Unit

2

                   6.00

              318.00

6

BENGKULU
EXISTING

1

ONGOING / PROPOSED

1

PLTU Muko-muko IPP

2

                   8.00

2

PLTU Ipuh / Kaur PLN-Sth Sumatera, Jambi  Bengkulu Reg Unit

2

                   6.00

3

PLTU Kaur PLN

2

              200.00

              214.00

7

JAMBI
EXISTING

1

 PLTU Semaran – Sarolangun PT. Permata Prima Elektrindo 2 14.00
ONGOING / PROPOSED

1

PLTU Lubuk Sepuh IPP

2

                14.00

2

PLTU Tanjung Jabung-Kuala Tungkal PLN-Sth Sumatera, Jambi  Bengkulu Reg Unit

2

                14.00

3

PLTU Tebo PLN-Sth Sumatera, Jmbi  Bengk Reg Unit/Truba Alam Manunggal

2

                14.00

4

PLTU Jambi IPP – PPP program 2012

2

              800.00

              842.00

8

SOUTH SUMATERA
EXISTING

1

PLTU Tanjung Enim -Bukit Asam PLN-South Sumatera Generation Unit

4

              260.00

2

PLTU Keramasan PLN-South Sumatera Generation Unit

2

                25.00

3

PLTU Bukit Asam PT BA for own use

3

                30.00

4

PLTU Simpang Belimbing PT. Guo Hua Energy Musi Makmur

2

              227.00

              542.00

ONGOING / PROPOSED

1

PLTU Musi Rawas PT. Sugico Pendrago Energi

2

                14.00

2

PLTU Talang Duku PLN-South Sumatera Generation Unit

2

                12.00

3

PLTU Muara Enim / Sumbagsel PT. Rajawali Koresia

4

              400.00

4

PLTU Banjarsari PT. Bukit Pembangkit Inovatif

2

              200.00

5

PLTU Sumsel 2 – Keban Agung –  Baturaja PT. Priamanaya Power Energy

2

              225.00

6

PLTU Tanjung Kemala – Baturaja PT BNYE

2

                20.00

7

PLTU Sumsel 5 / Bayung Lencir PT DSSP Power Sumsel (cons PT Dian Swastatika Sentosa (DSS)/PT Golden Energy Mines )

2

              300.00

8

PLTU Sumsel 6-MT Pendopo cons Pohan Steel Corporation (Posco) 44%, DH Power 51%, Bumi Resource 5%

2

              600.00

9

PLTU Sumsel 7-Sungai Lilin  PT Maddhucon Sriwijaya Power

2

              300.00

10

PLTU Sumsel 8 MT/Bangko Tengah PT. Huadian Bukit Asam Power (ptBA 45%-Huadian 55%)

5

          1,240.00

11

PLTU Sumsel 9 IPP – PPP program 2012

2

          1,200.00

12

PLTU Sumsel 10 IPP – PPP program 2012

1

              600.00

13

Sumsel 1 – Mulut Tambang IPP

2

              200.00

14

PLTU Banyuasin PT. Banyuasin Power Energi

2

              250.00

15

PLTU Tarahan PT. BA  for own use

2

                24.00

16

PLTU Tanjung Enim PT. BA  for own use

3

                30.00

17

PLTU Tarahan const PTBA, IL&FS, PT Mitra Jaya

2

          1,200.00

          6,815.00

9

BANGKA BELITUNG
EXISTING

1

PLTU Listrindo PT. Listrindo (IPP)

1

                   2.50

2

PLTU Bangka Belitung 3 – Air Anyer PLN

2

                60.00

                62.50

ONGOING / PROPOSED

1

PLTU Bangka Belitung 3 – Air Anyer PT. Capital Turbines Indonesia + dan PT Odira Energy Persada

2

                60.00

2

PLTU Bangka Belitung 4 – Belitung / Suge PLN

2

                33.00

3

PLTU Bangka Baru I IPP

2

                60.00

4

PLTU Bangka Baru II IPP

2

                14.00

5

PLTU Bangka Baru III IPP

2

                60.00

6

PLTU Tempilang (Cangkang) Bangka PT. Sawindo

1

                   7.00

7

PLTU Mempaya (cangkang sawit), Belitung PT. Sawindo

1

                   7.00

8

PLTU Muntok PLN

2

                14.00

9

PLTU Toboali IPP

2

                14.00

10

PLTU Listrindo PT. Listrindo (IPP)

1

                   5.00

11

PLTU Ketapang – Pangkalpinang PT. Babelindo Energi

2

                14.00

12

PLTU Kemitraan – Bangka – Merawang IPP

2

                20.00

13

PLTU Kemitraan – Belitung – Juruseberang IPP

2

                12.00

              320.00

10

LAMPUNG
EXISTING

1

PLTU Tarahan 3 & 4 PLN

2

              200.00

2

PLTU Tarahan 3 & 4 – Sebalang PLN

2

              200.00

3

PLTU Great Giant Pineapple PT Great Giant Pineapple Lampung

2

                14.00

4

PLTU Pelabuhan Tarahan PT. Bukit Asam

2

                16.00

              430.00

ONGOING / PROPOSED

1

PLTU Kalianda PT. Kalianda Kita Jaya

2

                12.00

2

PLTU lampung Tengah PT. Sepoetih Daya Prima

2

                14.00

3

PLTU Tulang Bawang PT. Central Daya Energi

4

              120.00

              146.00

11

BANTEN
EXISTING

1

PLTU Suralaya 1, 2, 3, 4, 5, 6, 7 PLN -.PT Indonesia Power

7

          3,400.00

2

PLTU Banten 1 – Suralaya unit 8 PLN -.PT Indonesia Power

1

              625.00

3

PLTU Banten 2 – Labuhan PLN

2

              600.00

4

PLTU DSS Tangerang PT Dian Swastika Sentosa

1

                19.00

5

PLTU DSS Serang PT. Dian Swastika Sentosa

1

              156.00

6

PLTU Banten 3 – Teluk Naga/Lontar PLN

3

              945.00

          5,745.00

ONGOING / PROPOSED

1

PLTU Banten PT. Lestari Banten energi (Genting Bhd 95% + Hero Inti Pratama 5%)

1

              660.00

2

PLTU Serang PT. Power Jawa Barat

2

              600.00

3

PLTU Cilegon PT. Daya Listrik Pratama

1

              450.00

4

PLTU Krakatau Steel PT. Krakatau Daya Listrik

1

              120.00

5

PLTU Bojong Manik cons Lebak Power

1

                20.00

          1,850.00

12

JAKARTA
EXISTING

1

PLTU Priok 3 & 4 PT. Indonesia Power

2

              100.00

2

PLTU Muara Karang PLN – Java Bali Generation Unit / PT. PJB

2

              400.00

              500.00

13

WEST JAVA
EXISTING

1

PLTU Indo Bharat Rayon PT. Indo Bharat Rayon (textile)

2

                21.60

2

PLTU Indorama Synthetics PT. Indorama Synthetics

2

                60.00

3

PLTU Jawa Barat – Indramayu PLN + China National Electric Engineering Co., Ltd. (CNEEC)

3

              990.00

4

PLTU DSS Karawang PT Dian Swastika Sentosa

2

              125.00

5

PLTU Cirebon PT. Cirebon Electric Power

1

              660.00

6

PLTU Jabar Selatan – Pelabuhan Ratu PLN

3

          1,050.00

          2,906.60

ONGOING / PROPOSED

1

PLTU Cirebon 2 Marubeni & Indika Energy

1

          1,000.00

2

PLTU Tanjung Jati A PT. Tanjung Jati Power Company

2

          1,320.00

3

PLTU Tanjung Jati C PT. HI Power Tubanan

2

          1,320.00

4

PLTU Jawa Barat Baru PLN

1

          1,000.00

5

PLTU Indramayu Baru PLN

2

          2,000.00

          6,640.00

14

CENTRAL JAVA
EXISTING

1

PLTU Cilacap 1 & 2 PT. Sumber Segara Primadaya

2

              600.00

2

PLTU Tanjung Jati B PLN – Tanjung Jati B – Generation Unit

2

          1,320.00

3

PLTU Tanjung Jati B – expansion Korea Midland Power Co

2

          1,324.00

4

PLTU Jawa Tengah 1 – Rembang PLN

2

              630.00

5

PLTU Tambak Lorok PLN – PT. Indonesia Power

3

              300.00

6

PLTU Pura Barutama PT. Pura Barutama – Kudus

2

                15.00

          4,189.00

ONGOING / PROPOSED

1

PLTU Cilacap 3 & 4 PT. Sumber Segara Primadaya

2

              600.00

2

PLTU jawa Tengah 2 – Adipala PLN

2

              660.00

3

PLTU Jawa Tengah Baru PLN

2

          2,000.00

4

PLTU Jawa Tengah / Pemalang / PPP PT. Bhimasena Power Indonesia

2

          2,000.00

          5,260.00

15

YOGYAKARTA
None

16

EAST JAVA
EXISTING

1

PLTU Paiton I Unit 7 & 8 PT. Paiton Energy Corp

2

          1,230.00

2

PLTU Paiton II 5 & 6 PT. Jawa Power

2

          1,220.00

3

PLTU Paiton III expansion 3 & 4 Paiton Energy Corp

1

              815.00

4

PLTU Paiton PJB Unit 1 & 2 PLN – Java Bali Generation Unit / PT. PJB

2

              800.00

5

PLTU Suparma PT. Suparma (pulp industry)

1

                27.00

6

PLTU Pakerin PT. Pakerin (pulp industry)

1

                34.00

7

PLTU Perak PLN – PT. Indonesia Power

2

              100.00

8

PLTU Prima Elektrik Power Jatim Prima Elektrik Power

1

                25.00

9

PLTU Gresik PLN – Java Bali Generation Unit / PT. PJB

4

              600.00

10

PLTU Adiprima Suraprinta PT. Adiprima Suraprinta

1

                25.00

11

PLTU Holcim Indonesia PT. Holcim Indonesia

1

                26.50

12

PLTU Jawa Timur 2 – Paiton Unit 9 PLN

1

660.00

13

PLTU Jawa Timur 1 – Pacitan PLN

2

              630.00

          6,192.50

ONGOING / PROPOSED

1

PLTU Jawa Timur 3-Tanjung Awar-awar-Tuban PLN (EPC : Sinomach, CNEEC dan PT Penta Adi Samudra)

2

              700.00

2

PLTU Madura PT. Madura Energi

2

              400.00

          1,100.00

17

BALI
EXISTING

1

ONGOING / PROPOSED

1

PLTU Celukan Bawang
PT. General Energy Bali + China Huadian Engineering Corporation Ltd + China Huadian Development

3

            426.00

2

PLTU Karang Asem PT. Truba Manunggal

2

     200.00

3

              626.00

18

WEST NUSA TENGGARA
EXISTING

1

PLTU Newmont Nusa Ternggara PT. Newmont Nusa Tenggara (NNT)

4

              112.00

2

PLTU Mataram -Lombok (APBN) = Jeranjang III PLN(EPC:Konsorsium WTC atau Wasa Mitra Engineering-Twink Indonesia-Ceria Putra Energi

1

                25.00

              137.00

ONGOING / PROPOSED

1

PLTU NTB 2 – Jeranjang Lombok Barat/ FTP1 PLN (EPC : PT. Barata Indonesia )

2

                50.00

2

PLTU Sumbawa Barat/Bima pilot project PLN & Twinnk Persie

2

                14.00

3

PLTU Sumbawa I /FTP2 Daewo International

2

                20.00

4

PLTU Lombok Baru 1/FTP2  PT Lombok Energy Dynamics

2

                50.00

5

PLTU Sumbawa Baru II PT. Misi Mulia Metrical

2

                30.00

6

PLTU Labuhan PT. Labuhan Power

2

                12.23

              176.23

19

EAST NUSA TENGGARA
EXISTING

1

PLTU NTT 1 – Ropa – Ende PLN

2

                14.00

2

PLTU Kupang PT. Indonesia Power & electrindo Perkasa Utama

2

                30.00

                44.00

ONGOING / PROPOSED

1

PLTU NTT 2 – Kupang Baru FTP1 PLN

2

                33.00

2

PLTU Kalabahi – Alor PLN

2

                   6.00

3

PLTU Rote Ndao PLN

2

                   6.00

4

PLTU Labuhan Bajo PLN

2

                   6.00

                51.00

20

WEST KALIMANTAN
EXISTING

1

ONGOING / PROPOSED

1

PLTU Kalbar 1 – Parit Baru PLN – PT. Bumi Rama Nusantara, Alton(s) Int. Pte-OJSC

2

              100.00

2

PLTU Bengkayang/Kalbar 2 – pantai kura2 – Tanjung Gundul Cons Indofuji, Guangdong, Persada Inti – Advance Technology

2

                55.00

3

PLTU Ketapang PLN, EPC : PT. Wijaya Karya

2

                20.00

4

PLTU Nanga Pinoh PLN

2

                   6.00

5

PLTU Sanggau PLN

2

                14.00

6

PLTU Sintang PLN (EPC : PT. Adhi Karya)

3

                21.00

7

PLTU Pontianak 1 IPP

1

                50.00

8

PLTU Pontianak 2 / Parit Baru PT. Equator Manunggal Power

2

                50.00

9

PLTU Pontianak 3 PT. Leyand International, Tbk – PT. Panin Financial, Tbk – PT. Permata Prima Elektrindo

2

                60.00

10

PLTU Ketapang Ketapang Arya Power

2

             12.00

              388.00

21

EAST KALIMANTAN
EXISTING

1

PLTU Embalut – Tanjung Batu PT. Cahaya Fajar Kaltim

2

                50.00

2

PLTU Lati PLN – East Kalimantan Regional Unit

2

                15.00

                65.00

ONGOING / PROPOSED

1

PLTU Embalut – Tanjung Batu – expansion PT. Cahaya Fajar Kaltim

1

                50.00

2

PLTU Kaltim 1 / Baru PT Gunung Bayan & Pemda Balikpapan

1

                50.00

3

PLTU Kaltim 2/FTP 2 – Kariangau PT. PLN – cons Adhi Karya and Sinohydro Co. Ltd

2

              200.00

4

PLTU Kaltim – Infrastucture / Kutai cons Ridlatama energi & mine energy holding

2

              200.00

5

PLTU Kaltim – MT – Samboja PT. Indo Ridlatama Power

2

                45.00

6

PLTU Melak/FTP 2 PT. Kalimantan Agung

2

                14.00

7

PLTU Nunukan/FTP 2 PT. Iner Powerindo Nunukan

2

                14.00

8

PLTU Tanah Grogot PT. Mahajaya Arya Satya

2

                14.00

9

PLTU Tanjung Selor PLN

2

                14.00

10

PLTU Berau-Tj. Redep/Lati PT. Indonesia Pusaka Berau

2

                14.00

11

PLTU Malinau (ds Kelapis – Malinau Utara) PLN

2

                   6.00

12

PLTU Kota Bangun PLN

2

                10.00

13

PLTU Muara Jawa/Tlk Balikpapan/FTP1 PLN

2

              220.00

14

PLTU Petung IPP

2

                14.00

15

PLTU Tarakan PT. Kayan Tarakan Power

2

                30.00

16

PLTU Sendawar PT. Bina energi investama

2

                20.00

17

PLTU Bontang PT. Indominco Mandiri

2

                14.00

18

PLTU MT Sangata (land owned by PT. KPC) PT. Bakrie Power

2

              200.00

19

PLTU Kariangau – Balikpapan PT. Kariangau Power

2

              200.00

          1,329.00

22

CENTRAL KALIMANTAN
EXISTING

1

PLTU Gunung Maranti Raya PT. Gunung Maranti Raya

1

                   6.00

2

PLTU Pangkalan Bun PT. Ekspoitasi Energi Indonesia

2

                14.00

                20.00

ONGOING / PROPOSED

1

PLTU 1 Kalteng – Pulang Pisau/FTP1 PLN

2

              120.00

2

PLTU Kuala Kurun IPP

2

                   6.00

3

PLTU Kalteng 1 / Gunung Mas IPP

2

              200.00

4

PLTU Buntok PLN

2

                14.00

5

PLTU Kuala Pambuang PLN

2

                   6.00

6

Pulang Pisau (Ekspansi) PLN

1

              100.00

              446.00

23

SOUTH KALIMANTAN
EXISTING

1

PLTU Asam-asam 1 & 2 PLN – South Kalimantan Regional Unit

2

              130.00

2

PLTU Asam-asam 3 & 4 PLN – Wika & Chengda

2

              130.00

3

PLTU Indocement Tarjun PT. Indocement Tarjun-cement industry

1

                55.00

4

PLTU Tanjung Alam Perkasa PT. Tanjung Alam Perkasa

1

                   7.50

5

PLTU Gunung Meranti Raya PT. Gunung Meranti Raya (plywood)

1

                   6.00

6

PLTU Hendratna PT. Hendratna Plywood

1

                   5.00

 7  PLTU Tabalong  PT. Makmur Sejahtera Wisesa (PT.Adaro Indonesia)  2

              60.00

 393.50
ONGOING / PROPOSED

1

PLTU Adaro (mine mouth) PT. Makmur Sejahtera Wisesa (PT.Adaro Indonesia)

2

             60.00

2

PLTU Kalsel 1 / FTP2 PT. Tanjung Power Indonesia (Korea East-West Power Co. (EWP) 35%+ Adaro 65%)

2

              200.00

              260.00

24

NORTH SULAWESI
EXISTING

1

PLTU Sulut 2 – Manado FTP 1 PLN

2

                50.00

ONGOING / PROPOSED

1

PLTU Amurang PT Mega Power International (MPI), PT Cogindo Daya Bersama dan PT Bagus Karya

2

                60.00

2

PLTU Tahuna IPP

2

                   8.00

3

PLTU Talaud PLN

2

                   6.00

4

PLTU Sulut 1 – Kema PT. Sakti Mas Mulia

2

                50.00

5

PLTU Minahasa/PPP IPP

2

              110.00

              234.00

25

GORONTALO
EXISTING

1

ONGOING / PROPOSED

1

PLTU Molotabu PT. Tenaga Listrik Gorontalo

2

                25.00

2

PLTU Gorontalo Energi PT. Tenaga Listrik Gorontalo

2

                12.00

                37.00

26

CENTRAL SULAWESI
EXISTING

1

PLTU Tawaeli – Palu PT. Pusaka Jaya Palu Power

2

                30.00

2

PLTU Mpanau PLN

1

                22.00

                52.00

ONGOING / PROPOSED

1

PLTU Luwuk / FTP 2 IPP

2

                20.00

2

PLTU Tawaeli – expansion PT. Pusaka Jaya Palu Power

2

                30.00

3

PLTU Kolonodale PLN

2

                   6.00

4

PLTU Ampana PLN

2

                   9.00

5

PLTU Leok PLN

2

                   6.00

6

PLTU Toli-toli PLN

2

                   6.00

7

PLTU Bangkir PLN

2

                   6.00

8

PLTU Palu IPP

1

                30.00

              113.00

27

WEST SULAWESI
EXISTING

1

ONGOING / PROPOSED

1

PLTU Mamuju IPP

2

                14.00

2

PLTU Mamuju PT Rekind Daya Mamuju

2

                50.00

                64.00

28

SOUTH EAST SULAWESI
EXISTING

1

PLTU Kendari-Nii Tanasa/FTP1 PLN

2

                20.00

ONGOING / PROPOSED

1

PLTU Kendari Baru 1/FTP2 PT. Tanasa Energi Power Makmur

2

                50.00

2

PLTU Kolaka IPP

2

                20.00

3

PLTU Kendari Baru 2 IPP

2

                50.00

4

PLTU Kendari 3 – extension PLN + Hutama Karya

1

                10.00

5

PLTU Bau-bau PLN

2

                20.00

6

PLTU Bau-bau/FTP2 PT. Bau Bau Mitra Energi

2

                20.00

7

PLTU Leok PLN

2

                   6.00

8

PLTU Tambu PLN

2

                   6.00

9

PLTU Raha PLN

2

                   6.00

10

PLTU Wangi-wangi PLN

2

                   6.00

11

PLTU ANTAM Pomalaa PT. Aneka Tambang

2

                60.00

12

PLTU Buton PT. Harmoni Energy Indonesia

2

                14.00

              268.00

29

SOUTH SULAWESI
EXISTING

1

PLTU Tonasa I (Boiler Turbine Generator) PT. Semen Gresik Tbk/PT. Semen Indonesia

2

                50.00

2

PLTU Tonasa II (Boiler Turbine Generator) PT. Semen Gresik Tbk/PT. Semen Indonesia

2

                70.00

3

PLTU Sulawesi Selatan – Barru/FTP1 PLN-South&South East Sulawesi Regional Unit

2

              100.00

4

PLTU Tello PLN-South&South East Sulawesi Regional Unit

2

                25.00

5

PLTU -Jeneponto I & II PT Bosowa Energy

2

              250.00

6

PLTU Bilibili PLN-South&South East Sulawesi Regional Unit

1

                   2.00

              497.00

ONGOING / PROPOSED

1

PLTU Tello PT. Misi Mulia Metrical

2

              130.00

2

PLTU Talaud PLN

2

                   6.00

3

PLTU Punagaya (ex PLTU Takalar) PLN

2

                   200.00

4

PLTU -Jeneponto III & IV PT Bosowa Energy

2

              300.00

5

PLTU Sulsel 3 – Takalar PT. Mutiara Situju

2

              200.00

6

PLTU Lakatong PT. Kassa Listindo

2

                90.00

7

PLTU Tonasa V PT. Semen Gresik

2

                70.00

8

PLTU Makassar PT. Omar Sapta Odang

2

              400.00

          1,396.00

30

MALUKU
EXISTING

1

ONGOING / PROPOSED

1

PLTU Maluku – Ambon Baru / Waai FTP1 PLN (EPC : PT Sakti Mas Mulia, Wuhan Kaidi Electric Power.Co.Ltd, PT Hilmanindo Signintama)

2

                30.00

2

PLTU Langgur PLN

2

                   6.00

3

PLTU Namlea – Buru PLN

2

                   6.00

4

PLTU Piru – Seram Barat PLN

2

                   6.00

5

PLTU Tual IPP

2

                   8.00

6

PLTU Waai (expansion) PLN

1

                15.00

7

PLTU New Ambon PT. Maluku Powerindo

2

                20.00

                91.00

31

NORTH MALUKU
EXISTING

1

PLTU Maluku Utara – Tidore/FTP1 PLN

1

                   7.00

ONGOING / PROPOSED

1

PLTU Maluku Utara – Tidore/FTP1 PLN

1

                   7.00

2

PLTU Sofifi PLN

2

                   6.00

3

PLTU Tidore Baru/FTP2 IPP

2

                14.00

4

PLTU Ternate PT. Kasella Powerindo

2

                12.00

5

PLTU Ternate IPP

1

                12.00

5

PLTU Halmahera PLN & PT. Aneka Tambang

9

              196.00

6

PLTU Tobelo/FTP2 IPP

2

                   6.00

              253.00

32

PAPUA
EXISTING

1

PLTU Freeport Indonesia PT. Freeport Indonesia Power Plant

3

              195.00

2

PLTU Papua 2 – Jayapura Baru FTP1 PLN

1

                10.00

              205.00

ONGOING / PROPOSED

1

PLTU Papua 1 – Timika FTP1 PLN + PT. Rekadaya Elektrika

2

                28.00

2

PLTU Papua 2 – Jayapura Baru FTP1 PLN

1

                10.00

3

PLTU Biak/FTP2 IPP

2

                14.00

4

PLTU Jayapura FTP2 – Skouw PT. Tenaga Listrik Jayapura

2

                30.00

5

PLTU Timika (extention) PLN + PT. Rekadaya Elektrika

2

                14.00

6

PLTU Jayapura PT. Sakti Mas Mulia

2

                30.00

7

PLTU Merauke FTP2 IPP

2

                14.00

8

PLTU Manokwari IPP

2

                14.00

9

PLTU Nabire/FTP 2 IPP

2

                14.00

              168.00

33

WEST PAPUA
EXISTING

1

ONGOING / PROPOSED

1

PLTU Andai  / FTP2 IPP

2

                14.00

2

PLTU Klalin / Makbusun – Sorong / FTP 2 IPP

2

                30.00

                44.00